This post was contributed by a community member. The views expressed here are the author's own.

Schools

Work Begins on Bridge at Beaumont High

The footbridge straddles a flood control canal, links the school with athletic fields

With the new stadium at Beaumont High School getting rave reviews, construction is underway on an access bridge to make getting to the stadium easier.

The new athletic complex is separated from the high school by a flood control canal.

The $1.2 million footbridge with stairs will include elevator access for those with special needs, and is expected to be completed in February.

Find out what's happening in Banning-Beaumontwith free, real-time updates from Patch.

More on the construction from the Press-enterprise is available here

We’ve removed the ability to reply as we work to make improvements. Learn more here

The views expressed in this post are the author's own. Want to post on Patch?